Case study · No. 214
The bathroom that leaked for four years.
Ampang terrace · 11 working days · RM 18,400
Ampang · Kuala Lumpur & Selangor
One bathroom in Ampang. Eleven working days from the first hammer to handover — at the fixed price we agreed before any of it started.
Day 1Day 11
Where the money goes
Scroll — the house comes apart. Two of these four layers are behind plaster the day we hand over.
↕ Keep scrolling to pull it apart
Contents
Tap a job — the drawing puts itself together, piece by piece.
Strip-out to the slab, new falls, a full waterproofing membrane, tiling and fittings. Ponding-tested twice and handed over cleaned.
Typically RM 12,000 – 22,000 · 9–14 daysCoverage
About 10 minutes from the yard. Free site visit, usually the same week.
Plate I — before / after
Drag the seam across the photo. Every picture here is our own job, photographed.
⇄
Ampang · master bathroom · membrane, screed and tiles fully redone11 working days · RM 18,400
Enquiries
Pick a scope, and we reply on WhatsApp within one working day — with a ballpark before we even visit.
Case study · No. 214
Ampang terrace · 11 working days · RM 18,400
The ledger
We publish what things actually cost. Tap a line to see it.
| Project | Cost |
|---|---|
"Quoted RM18,400 and that was exactly what I paid. Done in 11 days and they cleaned everything before leaving."Ms. Sim · Ampang
What happens next
No forms to chase, no site visit before you know roughly what it costs.
Start on WhatsApp
Ceiling downstairs keeps getting wet. Third time already.9:12 AM
Estimator
This is a standard two-storey terrace plan. The ranges are the real ones from the ledger above — the fixed quote comes after we measure.
The diary
Free within Ampang, Cheras, Kajang and Setapak. Forty minutes on site, and the measured price follows in writing.
Nothing is held until you send the message — one tap and the slot is written into it.
Confirm on WhatsAppPortfolio
Every frame photographed on handover day. Tap one to wipe back to day one.

AfterBefore
AfterBefore
AfterBefore
AfterBefore
AfterBeforeColophon
If it doesn't need doing yet, we'll say so — that is cheaper for both of us than a job you didn't need.