CONTOHRenovation & Plumbing · Est. 2018
WhatsApp
Job RecordOne bathroom · 11 working days

Ampang · Kuala Lumpur & Selangor

Your ceiling is wet. We find out why.

One bathroom in Ampang. Eleven working days from the first hammer to handover — at the fixed price we agreed before any of it started.

Established2018 · Taman Contoh, Ampang
Completed240+ homes across KL & Selangor
Typical bathroomRM 12,000 – 22,000 · 11 working days
Before we quote2 photos · 0 site visits
An Ampang bathroom before we started The bathroom on handover day Day 1Day 11

Bathrooms, kitchens, wiring and pipes. Every job priced in full before we lift a hammer — then documented daily until we hand the keys back.

Where the money goes

Where RM 96,000 goes.

Scroll — the house comes apart. Two of these four layers are behind plaster the day we hand over.

1234
Roof & waterproofingRM 14kTiles, flashing, deck membrane
Upper floorRM 31kBathroom rebuild, bedrooms, ceilings
Ground floorRM 38kKitchen, living, wet-and-dry, carpentry
Services & structureRM 13kRe-wiring, risers, slab making-good — none of it visible after

↕ Keep scrolling to pull it apart

Contents

What we take on.

Tap a job — the drawing puts itself together, piece by piece.

1Slab2Falls3Membrane4TileStrip to slab · falls · membrane · tilePonding-tested twice before tiling

Bathroom rebuild

Strip-out to the slab, new falls, a full waterproofing membrane, tiling and fittings. Ponding-tested twice and handed over cleaned.

Typically RM 12,000 – 22,000 · 9–14 days

Coverage

Ampang, and how far we go from it.

Sungai KlangMRR2Jalan AmpangJalan Cheras15 min25 min35 minOur yardAmpang JayaPandan IndahCherasSetapakWangsa MajuKuala LumpurKajang1 kmNRings = drive time, not distance

Ampang Jaya

About 10 minutes from the yard. Free site visit, usually the same week.

Ampang Jaya10 min
Pandan Indah12 min
Cheras20 min
Setapak25 min
Wangsa Maju25 min
Kuala Lumpur30 min
Kajang35 min

Plate I — before / after

Day one to handover, in eleven working days.

Drag the seam across the photo. Every picture here is our own job, photographed.

The bathroom before work started The bathroom on handover day ⇄
Day 1
Day 11

Ampang · master bathroom · membrane, screed and tiles fully redone11 working days · RM 18,400

2018trading since
240+homes finished
5 yrwaterproofing warranty
4.9from 87 reviews

Enquiries

Tell us what's wrong.

Pick a scope, and we reply on WhatsApp within one working day — with a ballpark before we even visit.

BathBedroomsLivingKitchenYard142356

Scope: Bathroom rebuild

Case study · No. 214

The bathroom that leaked for four years.

Ampang terrace · 11 working days · RM 18,400

Day 1Hacked to the slabTwo contractors had re-tiled over the old screed and blamed the neighbour upstairs.
Day 2Found itMembrane stopped 200mm short of the kerb, and the trap sat above the fall.
Day 3–8Rebuilt properlyNew falls, membrane turned 300mm up every wall, 48-hour ponding test — photographed.
Day 11Handed backFinal invoice matched the quote to the ringgit. Eighteen months on, the ceiling below is dry.

The ledger

Every job, with its real number.

We publish what things actually cost. Tap a line to see it.

ProjectCost
Ms. Sim's bathroom in Ampang on handover day
"Quoted RM18,400 and that was exactly what I paid. Done in 11 days and they cleaned everything before leaving."Ms. Sim · Ampang

What happens next

Send one photo. This is the whole process.

No forms to chase, no site visit before you know roughly what it costs.

Start on WhatsApp
26minutes from photo to price
Photos needed
2
Site visits before a price
0
Forms to fill in
0
The bathroom directly above the wet ceiling Ceiling downstairs keeps getting wet. Third time already.9:12 AM
That's coming from the bathroom floor above, not the neighbour. Can you send one more of the shower corner?9:26 AM
Sent. Tiles sound hollow when I knock.9:31 AM
Then the membrane is gone. Full rebuild — roughly RM 12,000 – 22,000, about 11 working days.9:38 AM
Free site visit Saturday 9am to measure and fix the exact price?9:38 AM
Yes please.9:44 AM

Estimator

Tap the rooms you're doing.

This is a standard two-storey terrace plan. The ranges are the real ones from the ledger above — the fixed quote comes after we measure.

Upper floorGround floorBathroomBedroomsLivingKitchenYard & deck

The diary

Pick a slot. We'll come and measure.

Free within Ampang, Cheras, Kajang and Setapak. Forty minutes on site, and the measured price follows in writing.

MONTUE WEDTHU FRISAT AMPM Open Open Taken Open Open Taken Taken Taken Taken Taken Open Off

Nothing is held until you send the message — one tap and the slot is written into it.

Confirm on WhatsApp

Portfolio

Swipe through the last six months.

Every frame photographed on handover day. Tap one to wipe back to day one.

Ampang bathroom, finishedThe bathroom beforeAfterBefore
Ampang · Bathroom11 days · RM 18,400
Cheras kitchen, finishedThe kitchen beforeAfterBefore
Cheras · Kitchen18 days · RM 32,900
Kajang living area, finishedThe living area beforeAfterBefore
Kajang · Whole home7 weeks · RM 96,000
Setapak wet and dry kitchen, finishedThe kitchen beforeAfterBefore
Setapak · Wet & dry16 days · RM 27,500
Ampang rewiring, finishedThe board beforeAfterBefore
Ampang · Re-wiring6 days · RM 9,800

Colophon

Send one photo. We'll tell you straight.

If it doesn't need doing yet, we'll say so — that is cheaper for both of us than a job you didn't need.

Call WhatsApp