BeforeAfter
Ampang · KL & Selangor · Since 2018
Renovation done the proper way.
Eleven working days apart. Drag to see it.
⇄ Drag anywhere across the photo
What you’re paying for
What RM 18,400 actually buys.
Scroll — the floor comes apart. Four of these six layers are invisible the day we hand over, which is exactly why they get skipped.
↕ Scroll to lift the layers
What we do
Tap the part of the house that's giving you trouble.
This is a typical Ampang terrace, cut open. Everything we touch is in here.
Bathroom rebuild
Strip-out to the slab, new falls, full waterproofing membrane, tiling and fittings. Ponding-tested twice and handed over cleaned.
Typically RM 12,000 – 22,000 · 9–14 days2 Tap any numbered part of the house
Why leaks come back
A bathroom floor is five layers. Skip one and it returns.
Most "fixed" bathrooms were re-tiled over the old screed. Scroll — this is what we actually rebuild.
- 1Structural slabWe hack right back to it. No building on top of the old problem.
- 2Screed, laid to fallWater has to run to the trap. Most "fixed" floors are flat or fall the wrong way.
- 3Waterproofing membraneTurned 300mm up every wall and over the kerb. This is the layer that was missing.
- 4Protection screedSo tiling doesn't puncture the membrane we just paid for.
- 5TileThen a 48-hour ponding test, photographed at both ends, before anything else goes in.
Where we work
How fast we can be at your door.
Ampang Jaya
About 10 minutes from our yard. Free site visit, and we can usually be there the same week.
Free site visit · Fixed quote after we measure◎ Tap the map, or a name here
Recent work
Homes we handed back.
Every tile shows the finished room. Tap one to wipe back to the day we walked in.

AfterBefore
AfterBefore
AfterBefore
AfterBefore
AfterBefore
AfterBeforeHow we work
You always know what happens next.
Doing it in stages
You don't have to do the whole house at once.
Tap the rooms you're thinking about. We'll split them the way we'd actually build them — wet works first, because those are the ones you can't redo later.
A range, not a quote — the exact number comes after we measure. Stages can be months apart; we leave the connections ready.
How it starts
A leak, a photo, and a price — before lunch.
Nobody drives over before you know the number. Keep scrolling — this is one real morning, start to finish.
Start on WhatsApp
Water pooling under the kitchen sink since last night. Water bill went up RM 60 too.7:52What owners say
Tap a review to see the job behind it.
- Scope
- Bathroom rebuild
- Duration
- 11 days
- Final invoice
- RM 18,400
Get a price
Point at what's wrong. We'll fill in the rest.
Tap the symptom on the house — the form fills itself, and you get a ballpark before we even visit.
◎ Tap the symptom you have — the form fills itself
Design with us
Put two finishes side by side before we buy either.
Same bathroom, same light. Pick one for each side, then drag the line.
Book a site visit
Take a slot. We'll come and look.
Free anywhere inside our 30-minute ring. Half an hour on site, price the same day.
Available site-visit slots